ArcGIS lab

0 comments

Lab 1 – Answer Sheet–I will provide you with my information to complete all of these steps

As you work through lab 1, answer the questions and provide the screenshots requested below. When finished, upload this document to Blackboard and ensure your work is saved on the CSCC ArcGIS Online site.

  1. Take a screenshot after you complete step 15 “Zoom to the Mersey River Watershed bookmark” in the “Inspect dams for fishway suitability” section. [10 points]
  1. Take a screenshot after you finish the “Create upstream watersheds from dams” section and include it below. [10 points]
  1. Take a screenshot after you finish the “Filter the hydrology data” section and include it below. [10 points]
  1. The required reading for this unit discussed the engineering fish passage design process. Discuss how the analysis you performed in this lab might contribute to the design process. [20 points]
  • Copy/Paste a screenshot of your Content page after completing your entire lab.To receive full credit, I need to see ALL layers, maps, and/or apps from this lesson with your name, username, initials, or some other unique identifier included in the name of each layer, map, and/or app. [50 points]

About the Author

Follow me


{"email":"Email address invalid","url":"Website address invalid","required":"Required field missing"}