WK7 517 Assignment 3 Cost and Quality

0 comments

Assignment 3: Cost and
Quality

This
assignment is a continuation and enhancement of Assignment 2.

Create a
Work Breakdown Structure (WBS), and assign resources and cost by using a project
management tool. As the IT project manager, you have been assigned a project to
deploy ten (10) wireless access points in your company’s warehouse and break
room within the next ninety (90) days. You are free to make assumptions that
satisfy the scope of the project such as training, wiring, consulting efforts,
etc.

Your
submission will be made in .mpp format and will be graded on the accuracy of
your work package assumptions and duration estimates.

In your
assignment, address the following:

  1. Create 15 or more decomposed work
    packages into 4 levels that are assigned to 5 or more main tasks (75 line
    items).
  2. Ensure the main WBS tasks headings are
    the 5 PMBOK® process areas.
  3. Create a Work Breakdown Structure Code
    for each task.
  4. Determine an overall project duration and
    duration estimates for each of the tasks. The duration is not to exceed 90
    days.
  5. Create accurate work package assumptions
    and duration estimates.
  6. Include 7 resources assigned in the
    Resource Sheet as “Work” types and 3 resources assigned as “ Material”
    types.
  7. Ensure the Resources are paid no more
    than $30/hour and that the “Material” cost per use will not exceed
    $50.
  8. Include your resources and materials from
    the Resource Sheet in the task sheet.
  9. Create 10 dependencies in the Task
    Sheet.

Your
assignment must follow these formatting requirements:

  • Microsoft Project or its open source
    alternative in .mpp format.