Work Breakdown Structure in Project Management Paper

Instructions:

Consider a recent project that you have worked on. This could be for a company or organization with which you are familiar, or even a personal project such as purchasing a home or planning a family gathering.

After your opening paragraph, which includes your thesis statement, identify your selected company or organization in no more than three paragraphs. Then, complete the following:

*Note: for the charts/diagrams, use MS Word, Excel, Google Docs or Google Sheets. You may also use any other suitable project-based software. A free Project management software called Libre is also available for download here https://sourceforge.net/projects/projectlibre/

  1. Create either a Work Breakdown Structure (WBS) of the project or Gantt Chart for planning and scheduling the project. Discuss why you used the type of chart you did.
  2. Determine and document both probabilistic (t0, tp, and tm) and deterministic time estimates. Discuss how you arrived at these time estimates.
  3. Using MS Word, Google Docs, or similar software, create a PERT network diagram with the Critical Path (CP) identified.
  4. Calculate the slack time for each activity. Discuss the ramifications of slack in the CP for the activities and the project as a whole.
  5. Develop the network diagram from the probability estimates. Discuss which path you would take and why.
  6. For each activity, determine hypothetical costs in a table. Include budgeted costs, percent complete, actual/projected cost, and over/under budget (and total). Discuss the rationale for how you derived these costs.
  7. Crash an activity on the Critical Path. Discuss the ramifications of crashing the activity you crashed.

Formatting requirements:

  • Your assignment is required to be 6-8 pages in length, which does not include the title page and reference pages, which are never a part of the content minimum requirements.
  • Charts/diagrams should be labeled and can be added within the body of your paper.
  • Support your submission with course material concepts, principles, and theories from the textbook and at least three scholarly, peer-reviewed journal articles. Use the Saudi Digital Library to find your resources.
  • Formatted according to APA 7th edition and Saudi Electronic University writing standards.
  • It is strongly encouraged that you submit all assignments into Turnitin prior to submitting them to your instructor for grading. If you are unsure how to submit an assignment into the Originality Check tool, review the Turnitin – Student Guide for step-by-step instructions. Review the grading rubric to see how you will be graded for this assignment.

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more
error: Content is protected !!